
Add to Cart
Household Display Multi Head Split System , Energy Saving Bedroom Air Conditioner
Bedroom Air Conditioner Features
Bedroom Air Conditioner Parameters
SPECIFICATIONS FOR 25 TON CRAWLER EXCAVATOR | |||
Main performance parameters | Cooling/Heating Capacity | btu | 12000/13000 |
Cooling/Heating Power Input | w | 1077/1150 | |
EER/COP | | 4.8/5.3 | |
Indoor Unit | Noise | dB(A) | 41/36/30/21 |
Air Volume | m3/h | 630 | |
Net Weight | kg | 9.5 | |
Dimensions | L*W*D(mm) | 846*177*275 | |
Outdoor unit | Compressor | | GMCC |
Noise | dB(A) | 50 | |
Net Weight | kg | 29 | |
Dimensions | L*W*D(mm) | 835*355*580 |
1, World famouns brand rotary type compressor
2, High Efficient Internal Thread Copper pipe for condensor and evaporator
3, LED digital display, Best Visibility
4, Self-diagnose capability, error code showing for detection convenience
5, Intelligent Defrost, Independent Dehumidification, Sleep Mode, Quiet Operation
6, Low Voltage Startup, Auto-protection, Auto Restart
7, Optional Refrigerant: R410A & R22
8, Optional Voltage: 220V/50Hz & 220V/60Hz
9, With CE, RoHS, ISO9001, ISO14001 standard
10, Sales Area: Mid East, Africa, South America, Europe, Asia, Central America, Oceania.
Our Services
1, Proposal and consulting
You could tell us your request,then we can give you solution
2, Design
Design on the basis of professional research and development strength, the best system, flow analysis, economic analysis, load calculation and equipment selection
3, Technical Installation team
4, Installation Materials Adopted.
5, Warranty Policy:
We guaranty 18 Months warranty for the products.
A. Repair include:compressor/fan motor/control panel/Receiver modules,thermal controller and other spare parts.
B. Because all the quality issues we should bear the cost maintenance and spare parts.
One of the following does not belong to the scope of the repair,But fees may apply maintenance
1, Damages caused during the transportation,load,installation which made by upload, transportation ,installation principal.
2, During the debug,damages caused by inappropriate test behaviors should be on charge by the debug team.
3, After debugging is completed and the equipments can be work normally,any mistaken manual operations made by the users should be on charge for the damage.
4, Any movements,dissemble and repair /maintenance operated by other company or person which leads to damage should be on response.
5, Natural disasters result from force manure